Instructional Design Portfolio


My designs use approachable colour themes tailored to each audience and purpose.

Las Jornadas de Bibliotecas Scolares for UNESCO

Conceptual understanding of change management for school libraries. Presentation in English (simultaneously translated in Spanish by UNESCO). For more details visit the blog post.

Created in Lucidchart
Course outline for online learning homepage

Moving from face-to-face learning to hybrid/remote learning required a different pedagogical strategy. This strategy uses colour to show continuity

Created in WeVideo
Trello for Project Management

Explaining the need for a cloud-based project management tool.

Created using Adobe InDesign
The nuts & bolts of BEV

Created for an assignment in graphic design as part of the Graduate Certificate in Instructional Design program at Royal Roads University.

Created in QuickTime using Google Slides
Lines, Stanzas and Syllables

Narrated instructional video on the topic of how to write poetry.

Needs Analysis Flowchart – developed for university – proposal from stakeholder for additional curriculum
Needs Analysis flowchart made using Canva
Collaborative project on Core Colour Concepts

Created for an assignment in graphic design as part of the Graduate Certificate in Instructional Design program at Royal Roads University. See how this page fits into the larger collaborative project:

Proposal for TVO’s ILC ENG 4U/4C class
As SME I wrote the words and ideas and the graphic design/IT team took it to fruition. It is housed here inside the TVO ILC domain.
Executive Summary example – increasing online learning uptake at a university